Appendix F - 2003 Michigan Residential Code
Click here for a printer-friendly version of this information.
RADON CONTROL METHODS
SECTION AF101
SCOPE
AF101.1 General.
This appendix contains requirements for new construction in jurisdictions
where radon-resistant construction is required.
Inclusion of this appendix by jurisdictions shall be determined through the use of locally available data or determination of Zone 1 designation.
(The following Michigan counties are designated as Zone 1, meaning they have the highest potential for elevated indoor radon levels: Branch, Calhoun, Cass, Hillsdale, Jackson, Kalamazoo, Lenawee, St. Joseph, and Washtenaw.)
SECTION AF102
DEFINITIONS
AF102.1 General.
For the purpose of these requirements, the terms used shall be defined as
follows:
SUB-SLAB DEPRESSURIZATION SYSTEM (Passive). A system designed to achieve lower sub-slab air pressure relative to indoor air pressure by use of a vent pipe routed through the conditioned space of a building and connecting the sub-slab area with outdoor air, thereby relying on the convective flow of air upward in the vent to draw air from beneath the slab. A system designed to achieve lower sub-slab air pressure relative to indoor air pressure by use of a vent pipe routed through the conditioned space of a building and connecting the sub-slab area with outdoor air, thereby relying on the convective flow of air upward in the vent to draw air from beneath the slab.
SUB-SLAB DEPRESSURIZATION SYSTEM (Active). A system designed to achieve lower sub-slab air pressure relative to indoor air pressure by use of a fan-powered vent drawing air from beneath the slab. A system designed to achieve lower sub-slab air pressure relative to indoor air pressure by use of a fan-powered vent drawing air from beneath the slab.
DRAIN TILELOOP. A continuous length of drain tile or perforated pipe extending around all or part of the internal or external perimeter of a basement or crawl space footing. A continuous length of drain tile or perforated pipe extending around all or part of the internal or external perimeter of a basement or crawl space footing.
RADON GAS. A naturally-occurring, chemically inert, radio-active gas that is not detectable by human senses. As a gas, it can move readily through particles of soil and rock and can accumulate under the slabs and foundations of homes where it can easily enter into the living space through construction cracks and openings. A naturally-occurring, chemically inert, radio-active gas that is not detectable by human senses. As a gas, it can move readily through particles of soil and rock and can accumulate under the slabs and foundations of homes where it can easily enter into the living space through construction cracks and openings.
SOIL-GAS-RETARDER. A continuous membrane of 6-mil (0.15mm)polyethylene or other equivalent material used to retard the flow of soil gases into a building. A continuous membrane of 6-mil (0.15mm)polyethylene or other equivalent material used to retard the flow of soil gases into a building.
SUB-MEMBRANE DEPRESSURIZATION SYSTEM. A system designed to achieve lower-sub-membrane air pressure relative to crawl space air pressure by use of a vent drawing air from A system designed to achieve lower-sub-membrane air pressure relative to crawl space air pressure by use of a vent drawing air from beneath the soil-gas-retarder membrane.
SECTION AF103
REQUIREMENTS
AF103.1 General.
The following construction techniques are intended to resist radon
entry and prepare the building for post-construction radon mitigation, if
necessary (see Figure AF102). These techniques are required in areas
where designated by the jurisdiction.
AF103.2 Subfloor preparation.
A layer of gas-permeable material shall be placed under all concrete
slabs and other floor systems that directly contact the ground and are
within the walls of the living spaces of the building, to facilitate future
installation of a sub-slab depressurization system, if needed. The
gas-permeable layer shall consist of one of the following:
- A uniform layer of clean aggregate, a minimum of 4 inches (102mm)thick. The aggregate shall consist of material that will pass through a 2-inch (51 mm) sieve and be retained by a 1/4-inch (6.4 mm) sieve.
- A uniform layer of sand (native or fill), a minimum of 4 inches (102 mm) thick, overlain by a layer or strips of geotextile drainage matting designed to allow the lateral flow of soil gases.
- Other materials, systems or floor designs with demonstrated capability to permit depressurization across the entire sub-floor area.
AF103.3 Soil-gas-retarder.
A minimum 6-mil (0.15 mm) [or 3-mil (0.075 mm) cross-laminated] polyethylene
or equivalent flexible sheeting material shall be placed on top of the
gas-permeable layer prior to casting the slab or placing the floor assembly
to serve as a soil-gas-retarder by bridging any cracks that develop in the
slab or floor assembly and to prevent concrete from entering the void spaces
in the aggregate base material. The sheeting shall cover the entire floor
area with separate sections of sheeting lapped at least 12 inches (305 mm).
The sheeting shall fit closely around any pipe, wire or other penetrations
of the material. All punctures or tears in the material shall be sealed or
covered with additional sheeting.
AF103.4 Entry routes.
Potential radon entry routes shall be closed in accordance with
Sections AF103.4.1 through AF103.4.10. Potential radon entry routes shall be
closed in accordance with Sections AF103.4.1 through AF103.4.10.
AF103.4.1 Floor openings.
Openings around bathtubs, showers, water closets, pipes, wires or other
objects that penetrate concrete slabs or other floor assemblies shall be
filled with a polyurethane caulk or equivalent sealant applied in accordance
with the manufacturer’s recommendations.
AF103.4.2 Concrete joints.
All control joints, isolation joints, construction joints and any other
joints in concrete slabs or between slabs and foundation walls shall be
sealed with a caulk or sealant. Gaps and joints shall be cleared of loose
material and filled with polyurethane caulk or other elastomeric sealant
applied in accordance with the manufacturer's recommendations.
AF103.4.3 Condensate drains.
Condensate drains shall be trapped or routed through nonperforated pipe
to daylight.
AF103.4.4 Sumps.
Sump pits open to soil or serving as the termination point for sub-slab
or exterior drain tile loops shall be covered with a gasketed or otherwise
sealed lid. Sumps used as the suction point in a sub-slab
depressurization system shall have a lid designed to accommodate the vent
pipe. Sumps used as a floor drain shall have a lid equipped with a trapped
inlet.
AF103.4.5 Foundation walls.
Hollow block masonry foundation walls shall be constructed with either a
continuous course of solid masonry, one course of masonry grouted solid, or
a solid concrete beam at or above finished ground surface to prevent passage
of air from the interior of the wall into the living space. Where a brick
veneer or other masonry ledge is installed, the course immediately below
that ledge shall be sealed. Joints, cracks or other openings around all
penetrations of both exterior and interior surfaces of masonry block or wood
foundation walls below the ground surface shall be filled with polyurethane
caulk or equivalent sealant. Penetrations of concrete walls shall be
filled.
AF103.4.6 Damp proofing.
The exterior surfaces of portions of concrete and masonry block walls below
the ground surface shall be dampproofed in accordance with Section R406 of
this code.
AF103.4.7 Air-handling units.
Air-handling units in crawl spaces shall be sealed to prevent air from being
drawn into the unit. (Exception: Units with gasketed
seams or units that are otherwise sealed by the manufacturer to prevent
leakage.)
AF103.4.8 Ducts.
Ductwork passing through or beneath a slab shall be of seamless material
unless the air-handling system is designed to maintain continuous positive
pressure within such ducting. Joints in such ductwork shall be sealed to
prevent air leakage.
Ductwork located in crawl spaces shall have all seams and joints sealed by closure systems in accordance with Section M1601.3.1.
AF103.4.9 Crawl space floors.
Openings around all penetrations through floors above crawl spaces shall be
caulked or otherwise filled to prevent air leakage.
AF103.4.10 Crawl space access.
Access doors and other openings or penetrations between basements and
adjoining crawl spaces shall be closed, gasketed or otherwise filled to
prevent air leakage.
AF103.5 Passive sub-membrane depressurization
system.
In buildings with crawl space foundations, the following components of a
passive sub-membrane depressurization system shall be installed during
construction. (Exception: Buildings in which an
approved mechanical crawl space ventilation system or other equivalent
system is installed.)
AF103.5.1 Ventilation.
Crawl spaces shall be provided with vents to the exterior of the
building. The minimum net area of ventilation openings shall comply with
Section R408.1 of this code.
AF103.5.2 Soil-gas-retarder.
The soil in crawl spaces shall be covered with a continuous layer of minimum
6-mil (0.15 mm) polyethylene soil-gas-retarder. The ground cover shall
be lapped a minimum of 12 inches (305 mm) at joints and shall extend to
all foundation walls enclosing the crawl space area.
AF103.5.3 Vent pipe.
A plumbing tee or other approved connection shall be inserted horizontally
beneath the sheeting and connected to a 3- or 4-inch-diameter (76 mm or 102
mm) fitting with a vertical vent pipe installed through the sheeting. The
vent pipe shall be extended up through the building floors, terminate at
least 12 inches (305 mm) above the roof in a location at least 10 feet
(3048mm)away from any window or other opening into the conditioned spaces of
the building that is less than 2 feet (610 mm) below the exhaust point, and
10 feet (3048 mm) from any window or other opening in adjoining or adjacent
buildings.
AF103.6 Passive sub-slab depressurization
system.
In basement or slab-on-grade buildings, the following components of a
passive sub-slab depressurization system shall be installed during
construction.
AF103.6.1 Vent pipe.
A minimum 3-inch-diameter (76 mm) ABS, PVC or equivalent gas-tight pipe
shall be embedded vertically into the sub-slab aggregate or other permeable
material before the slab is cast. A "T" fitting or equivalent method shall
be used to ensure that the pipe opening remains within the sub-slab
permeable material. Alternatively, the 3-inch (76mm) pipe shall be inserted
directly into an interior perimeter drain tile loop or through a sealed sump
cover where the sump is exposed to the sub-slab aggregate or connected to it
through a drainage system. The pipe shall be extended up through the
building floors, terminate at least 12 inches (305 mm) above the surface of
the roof in a location at least 10 feet (3048 mm) away from any window or
other opening into the conditioned spaces of the building that is less than
2 feet (610 mm) below the exhaust point, and 10 feet (3048 mm) from any
window or other opening in adjoining or adjacent buildings.
AF103.6.2 Multiple vent pipes.
In buildings where interior footings or other barriers separate the sub-slab
aggregate or other gas-permeable material, each area shall be fitted with an
individual vent pipe. Vent pipes shall connect to a single vent that
terminates above the roof or each individual vent pipe shall terminate
separately above the roof.
AF103.7 Vent pipe drainage.
All components of the radon vent pipe system shall be installed to provide
positive drainage to the ground beneath the slab or soil-gas-retarder.
AF103.8 Vent pipe
accessibility.
Radon vent pipes shall be accessible for future fan installation through an
attic or other area outside the habitable space.
(Exception: The radon vent pipe need not be accessible
in an attic space where an approved roof-top electrical supply is provided
for future use.)
AF103.9 Vent pipe
identification.
All exposed and visible interior radon vent pipes shall be identified with
at least one label on each floor and in accessible attics. The label shall
read: "Radon Reduction System."
AF103.10 Combination
foundations.
Combination basement/ crawl space or slab-on-grade/crawl space foundations
shall have separate radon vent pipes installed in each type of foundation
area. Each radon vent pipe shall terminate above the roof or shall be
connected to a single vent that terminates above the roof.
AF103.11
Building depressurization.
Joints in air ducts and plenums in unconditioned spaces shall meet the
requirements of Section M1601. Thermal envelope air infiltration
requirements shall comply with the energy conservation provisions in Chapter
11. Firestopping shall meet the requirements contained in Section
R602.8.
AF103.12 Power
source.
To provide for future installation of an active sub-membrane or sub-slab
depressurization system, an electrical circuit terminated in an approved box
shall be installed during construction in the attic or other anticipated
location of vent pipe fans. An electrical supply shall also be accessible in
anticipated locations of system failure alarms.
Figure AF 102 - Radon-Resistant Construction Details for Four Foundation Types
page updated 1/31/07